WORKS AND TECHNICAL SERVICES
Works and Technical Services
Introduction
The Works Department comprises of Roads, Water, mechanical, Electrical and Housing sectors which are basically mandated to handle issues of infrastructure Development in the District. The national roads are developed and maintained by Uganda National Roads Authority under the Ministry of Works and Transport. The District Local Government maintains district roads while Community access roads are the responsibility of the Lower Local Governments.
The District has a total road network of 1013 km. This network is divided into three major categories. Truck roads, are under the Ministry of Works and Transport/Uganda National Roads Authority, while the District is responsible for the feeder roads and the sub counties are responsible for the community access roads. Manafwa District has three topographical features i.e. rugged mountain relief in the north and northeast, rolling terrain in the central and south and flat terrain in the South Western part. These features have significant bearing on the sustainability of the road sector as it impact greatly on the cost of road construction and maintenance.
The Objective of the road sector is to make 70% of road network motorable
Roads by grade, Length and condition
Table 1: Roads by Type, length and condition as of 2018
Type |
Road code |
Road |
Distance (km) |
Class |
Condition |
Trunk roads |
|
Bumbobi-Lwakhakha Road |
29 |
B |
Good |
|
Bubulo –Buwagani corner |
11 |
B |
Fair |
|
|
|
Total –Trunk roads |
40 |
|
|
District gravel Roads
|
5826 |
Bugobero-Molo |
6.7 |
C |
Fair |
5876 |
Nabiskhi-Munamba |
8 |
C |
Fair |
|
5847 |
Sibanga-Bunyinza |
8 |
C |
Fair |
|
5824 |
Butiru-Bukhaweka |
9 |
C |
Fair |
|
5804 |
Shikoye-Bugobero |
6.7 |
C |
Fair |
|
5851 |
Sibanga-Masaaka |
5.7 |
C |
Fair |
|
5836 |
Butiru-Salosalo |
8.6 |
C |
Fair |
|
5868 |
Buwangani-Shigunga |
6 |
C |
Fair |
|
5888 |
Namutembi-Matsanza |
2.4 |
C |
Fair |
|
5873 |
Sibanga-Sibale |
7.1 |
C |
Fair |
|
District Gravel roads |
5859 |
Bugobero-Wamoya |
5.1 |
C |
Fair |
5887 |
Burukuru-Mayenze |
7 |
C |
Fair |
|
5867 |
Mwikaye-Isanga |
7 |
C |
Fair |
|
5855 |
Ikaali-Nambale |
5.35 |
C |
Fair |
|
5874 |
Kitsi-Nalondo |
5.6 |
Earth road |
Fair |
|
5850 |
Kabaale-Ikaali-Namaloko |
8 |
C |
Fair |
|
|
Buweswa-Buwagogo-Bukewa |
7 |
c |
Fair |
|
|
Namekhala-Bunyinza-Namboko |
10.5 |
c |
Fair |
|
|
Masaka-Mutete |
4 |
B |
Good |
|
|
Wesswa-Butoto |
3 |
c |
Fair |
|
|
Mwarake -Luwanjusi |
10 |
C |
Fair |
|
|
Namweke-Makenya |
6 |
C |
Fair |
|
|
Butoto-Bungati |
3 |
C |
bad |
|
|
Butiru-Nauyo-Ikaali |
8 |
C |
Bad |
|
|
Bulyui -Namweke |
5 |
C |
Fair |
|
|
Lukale-Shigunga |
3 |
C |
Fair |
|
|
|
Total Gravel roads |
165.75 |
|
|
Source: Manafwa District roads annual report 2017
Housing
The housing in this category basically includes buildings/rooms being used for Office accommodation for the various departments within the district.
Table 2: Capacity and Condition of District Office Blocks
Department/Sector |
No. Of offices (Rooms) |
Ownership (district/ rented) |
Location (district Headquarters/off) |
Adequacy (Yes/No) |
Condition (good/fair/bad) |
Finance |
4 |
District |
District Headquarters |
No |
Good |
Council |
7 |
District |
District Headquarters |
No |
Good |
Medical |
6 |
District |
District Headquarters |
Yes |
Fair |
Production |
3 |
District |
District Headquarters |
No |
Good |
Police |
7 |
District |
District Headquarters |
No |
Good |
Education |
4 |
District |
District Headquarters |
No |
Good |
Ears |
0 |
0 |
0 |
0 |
0 |
Works |
4 |
District |
District Headquarters |
No |
Fair |
Prisons |
1 |
District |
District Headquarters |
No |
Good |
Audit/DSC/Fisheries |
7 |
District |
District Headquarters |
No |
Good |
Water |
2 |
District |
District Headquarters |
No |
Good |
Labour |
1 |
District |
District Headquarters |
No |
Fair |
Administration |
11 |
District |
District Headquarters |
No |
Good |
Land office |
1 |
District |
District Headquarters |
No |
Good |
Environment |
2 |
District |
District Headquarters |
No |
Good |
Source:
Mechanical (vehicles and plants)
This is the section under works and technical services which is responsible for the maintenance and custody of the district vehicles and motorcycles.
Table 3: Status of Vehicles as at June 2018
Registration Number |
Make/model |
Type |
Present location |
Condition (remarks) |
UAJ025X |
TOYOTA Hilux |
D/C |
Production |
Broken Down |
UG2188m |
Nissan |
H/BOD |
Bugobero H/C |
Broken Down |
LG0002-30 |
Toyota Hilux |
D/C |
Manafwa |
SCRAP |
LG00019=67 |
Toyota |
D/C |
Engineering |
Running |
LG0001-67 |
Toyota |
D/C |
Engineering |
Scrap |
UG.2956R |
Ford ranger |
D/C |
Manafwa |
Running |
UG. 1249R |
Ford Ranger |
D/C |
Council |
Scrap |
UG1995A |
MITSUBISHI |
D/C |
MANAFWA |
Running |
LG0046-67 |
TOYOTA minibus |
|
Bubulo H/C |
Running |
UAM795C |
TOYOTA HILUX |
|
Bugobero H/C |
Broken Down |
LG0047-67 |
TOYOTA HILUX |
D/C |
MANAFWA |
Running |
LG0001-071 |
GRADER |
Changlin |
Engineering |
RUNNING |
LG0002-071 |
TIPPER/DUMPER |
FAW |
Engineering |
Running |
LG0003-071 |
GMC-DOUBLE CABIN PICK UP |
JMC |
Engineering |
Running |
LG0005-071 |
GMC-DOUBLE CABIN PICK UP |
JMC |
Manafwa T/ council |
Running |
LG0006-071 |
TIPPER/DUMPER |
FAW |
Manafwa T/ council |
Broken Down |
LG0007-071 /LG0008-071 |
Tractor/Carrier |
JMC |
Manafwa T/ council |
Broken Down |
UG 2612W |
TIPPER/DUMPER |
MITSUBISH |
Engineering |
NEW |
UG 2354W |
TIPPER/DUMPER |
MITSUBISH |
Engineering |
NEW |
UG 2463W |
WATER BOWSER |
MITSUBISH |
Engineering |
NEW |
UG 1996W |
GRADER |
KOMATSU |
Engineering |
NEW |
UG 2042W |
WHEEL LOADER |
KOMATSU |
Engineering |
NEW |
UG 2698 W |
Vibro roller |
Sakai |
Engineering |
NEW |
UG 0490 Z |
Ford ranger |
Double Cabin |
Natural Resources |
Running |
UG 0874 Z |
Toyota |
Double Cabin |
Administration |
Running |
UG 4606M |
Toyota |
Double Cabin |
Health |
Running |
UG 3200 R |
Ford ranger |
Double Cabin |
Council |
Running |
Table 4: Status of Motorcycles as at June 2018
Registration number |
Make/model |
Type |
Present location |
Condition (remarks) |
UG1540R |
JAILING |
|
BUGOBERO S/C |
Broken Down |
UG1555R |
JAILING |
|
KAATO |
Broken Down |
UG1555R |
JAILING |
|
SIBANGA S/C |
Broken Down |
UG1669R |
JAILING |
|
MANAFWA DLG |
Broken Down |
U0089G |
YAMAHA |
DT125 |
CBS |
OPERATIONAL |
UDA95U |
HONDA |
XL |
BUGOBERO S/C |
OPERATIONAL |
LG001867 |
HONDA |
XL 125 |
PRODUCTION |
RUNNING |
UG1660R |
JAILING |
|
BUKUSU S/C |
Broken Down |
UG3450M |
YAMAHA |
DT125 |
Bubulo H/C |
RUNNING |
UG3567M |
SUZUKI |
TF |
HEALTH |
Running |
UG3577M |
YAMAHA |
DT175T5Q |
HEALTH |
Running |
UG3585M |
YAMAHA |
AG1005H51 |
HEALTH |
Running |
UG1980E |
HONDA |
XL |
EUDCATION DEPT |
RUNNING |
UAC |
HONDA |
2000 |
AUDIT |
Broken Down |
UG3583M |
YAMAHA |
AG100 |
HEALTH |
OPERATIONAL |
UG3360M |
YAMAHA |
AG100 |
BUGOBERO H/ C/IV |
RUNNING |
LG0006-67 |
HONDA |
125 |
T/COUNCIL |
Broken Down |
UG3012M |
YAMAHA |
AG100 |
Bubulo H/C |
NOT RUNNING |
UG1660R |
JIALING |
|
BUKUSU S/C |
Broken Down |
LG0038-67 |
YAMAHA |
125 |
BUGOBERO |
Broken Down |
LG0028-67 |
YAMAHA |
125 |
BUTIRU S/C |
Broken Down |
LG0040-67 |
YAMAHA |
125 |
BUWAGOGO |
Broken Down |
LG00039-67 |
YAMAHA |
125 |
BUNABWANA S/C |
Broken Down |
LG0041-67 |
YAMAHA |
125 |
BUTTA S/C |
Broken Down |
LG0043-67 |
YAMAHA |
125 |
SISUNI S/C |
Broken Down |
UBA 420Y |
HONDA |
125 |
NATURAL RESOURCES |
RUNNING |
LG0042-67 |
YAMAHA |
125 |
BUKUSU S/C |
Broken Down |
LG0044-67 |
YAMAHA |
125 |
KAATO |
Broken Down |
LG0020-67 |
YAMAHA |
125 |
KHABUTOOLA |
Broken Down |
LG0032-67 |
YAMAHA |
125 |
SIBANGA S/C |
Broken Down |
LG0030-67 |
YAMAHA |
125 |
BUSUKUYA |
Broken Down |
UF3585M |
YAMAHA |
125 |
Bubulo H/C |
Running |
UBA 1062 |
YAMAHA |
|
BUKUSU S/C |
Running |
UG1668R |
JAILING |
|
BUKUSU S/C |
Running |
LG0016-67 |
HONDA |
XL125S |
ENGINEERING |
Broken Down |
LG0015-67 |
HONDA |
XL125S |
ENGINEERING |
Broken Down |
UG1630S |
HONDA |
XL |
NATURAL RESOURCES |
Broken Down |
UDA295U |
YAMAHA |
125 |
BUGOBERO |
RUNNING |
UL0009-67 |
HONDA |
XL125 |
BUTIRU S/C |
Broken Down |
UDA555U |
HONDA |
TS125 |
BUWAGOGO |
RUNNING |
UG1555R |
JAILING |
|
KAATO |
Broken Down |
LG0076-30 |
YAMAHA |
AG100 |
ENGINEERING |
Broken Down |
This subsection looks at physical planning of both commercial and residential areas. The main objective is to increase access to housing for all income groups, for rental and owner occupation. The output indicators under physical planning are presented in Table 6.3.
Table 3: Indicators under Physical Planning
Indicator |
Value |
Proportion of households with approved plans |
No empirical data |
Number of housing units constructed |
No empirical data |
Number of housing units occupied |
No empirical data |
Number of housing unit with approved architectural design |
No empirical data |
Number of trading centres that are planned |
No empirical data |
Water and Sanitation
Objectives of the sector
~
To increase safe water coverage;
~
To promote sanitation and hygiene awareness ; and
~
To strengthen institutional/community participation in operation and maintenance of water and sanitation facilities.
Table 5: Distribution of Water Points by Type and Sub-County
No. |
County |
Sub County |
Population |
TECHNOLOGY TYPES |
%ge Coverage per S/County
|
|||||||
Boreholes |
Shallow Wells |
Springs |
GFS Taps |
Rainwater harvesting |
Total Functional |
Non Functional |
Total Sources |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Bubulo |
Bugobero |
15,442 |
20 |
1 |
7 |
0 |
2 |
28 |
5 |
30 |
49.9 |
2 |
Bubulo |
Bukusu |
16,652 |
11 |
0 |
21 |
0 |
4 |
32 |
4 |
36 |
45.0 |
3 |
Bubulo |
Bunabwana |
11,272 |
13 |
1 |
10 |
0 |
3 |
24 |
6 |
27 |
55.0 |
4 |
Bubulo |
Busukuya |
13,832 |
25 |
1 |
13 |
0 |
3 |
39 |
2 |
42 |
75.2 |
5 |
Bubulo |
Butiru |
19,019 |
28 |
2 |
12 |
0 |
6 |
42 |
6 |
48 |
39.0 |
6 |
Bubulo |
Butta |
6,373 |
25 |
1 |
10 |
0 |
2 |
36 |
4 |
38 |
91.0 |
7 |
Bubulo |
wesswa |
8,136 |
0 |
0 |
46 |
9 |
1 |
55 |
3 |
56 |
95.0 |
8 |
Bubulo |
Buwagogo |
8,526 |
2 |
0 |
39 |
0 |
1 |
41 |
2 |
42 |
95.0 |
9 |
Bubulo |
Kaato |
4,678 |
3 |
0 |
38 |
17 |
1 |
58 |
12 |
59 |
95.0 |
10 |
Bubulo |
Khabutoola |
16,069 |
25 |
0 |
25 |
0 |
0 |
50 |
5 |
50 |
70.0 |
11 |
Bubulo |
Manafwa T/C |
14,993 |
18 |
0 |
30 |
5 |
2 |
53 |
4 |
55 |
75.0 |
12 |
Bubulo |
Sibanga |
7,933 |
27 |
1 |
9 |
0 |
2 |
37 |
7 |
39 |
95.0 |
13 |
Bubulo |
Nalondo |
6,306 |
1 |
|
|
|
|
|
|
|
95.0 |
14 |
Bubulo |
Bukhofu |
7,933 |
|
|
|
|
|
|
|
|
57.0 |
15 |
|
Buwangani TC |
5,545 |
|
|
|
|
|
|
|
|
93.0 |
16 |
|
Bunyinza TC |
2,441 |
|
|
|
|
|
|
|
|
62.0 |
17 |
Bubulo |
Sisuni |
4,820 |
8 |
0 |
5 |
0 |
1 |
13 |
1 |
14 |
69.0 |
TOTAL |
169,970 |
206 |
7 |
265 |
31 |
28 |
508 |
61 |
536 |
65.5 |
Source:
- Functionality 88.6%
- Non-Functionality 11.4%
- District Water Coverage 65.5%